29 May, 2008
KUALA LUMPUR: Toll concessionaires collected RM439.4 million in 2007 from the three highways in Puchong, said Works Minister Datuk Mohd Zin Mohamed in a written reply to a question by Gobind Singh Deo (Puchong-DAP)
The Lebuhraya Damansara-Puchong (LDP) collected RM200.9 million while Lebuhraya Shah Alam (Kesas) and Lebuhraya Baru Pantai (NPE) collected RM171.8 million and RM66.7 million respectively.
Mohd Zin said the toll rates for LDP were revised down in 1999 to RM1 from RM1.50 and in 2007, the rate was revised up to RM1.60 from the scheduled RM2.10.
- The Edge
No comments:
Post a Comment